What are the Side Effects of Transportation?

Impact of Transportation

What are the Side Effects of Transportation Waste? Transportation is one of the major wastes in a shop floor. It also has a lot of Side Effects. These side effects are more dangerous than the waste itself. Transportation means moving the product from one location to another location. There is no value addition during this […]

Difference between Line Balancing and Load Levelling?

What is the difference between Line Balancing and Load Levelling Even a lot of senior professionals from the industry are confused on these terms. Imagine a company that manufactures Toothpaste and there are 4 different types of toothpaste flavours (Regular, Salt, Blue Gel and Red Gel). The processes for manufacturing are:1. Mixing the chemicals – […]

What are the common problems with High Setup time in machines?

What are the common problems of High Setup time in machines? In this post, I have listed 10 major wastes / issues created by high setup time. 1. Increases OverProduction – People don’t do frequent changeovers (as setup time is high) – increases WIP 2. High Working Capital Requirement for running the unit 3. High […]

SMED Implementation at JK Tyres, Chennai

SMED Implementation at JK Tyres, Chennai How to implement SMED in 3 days? Step By step approach in implementing Quick Change-over Introduction: We have conducted a 3-day workshop on SMED at JK Tyres, Chennai plant  in 2018, focusing on the bottleneck machine’s change overtime reduction. The bottleneck machine was identified and the current change-over-time was […]

Thanks For Submitting

The download link has been sent to Successfully
(Kindly do check spam Inbox, if not received)