SMED Workshop / Implementation at JK Tyres, Chennai

December 12, 2018

Introduction: We have conducted a 3 day workshop on SMED at JK Tyres, Chennai plant focusing on the bottleneck machine’s changeover time reduction. Before State (As-Is Situation): The bottleneck machine was identified and the current change-over time was around 23

Read More

5S Implementation at Chromaprint, Coimbatore

March 24, 2018

Introduction: We have started working with a large Printing company based in Coimbatore which supplies to all major FMCG and Liquor brands in the country. Before State (As-Is Situation): The plant was untidy, unorganised and many machines leaked oil and

Read More

5S Implementation at a large Switchgear Manufacturer in Chennai

March 24, 2018

Introduction: We worked with a large Switch Gear manufacturer based in Chennai in implementing 5S across their 3 units. Before State (As-Is Situation): The plant was untidy, unorganised and many machines leaked oil and the work environment was not conducive

Read More

Operational Excellence at VKC Footwear, Mysore

March 24, 2018

Introduction: We worked with VKC Footwear (headquartered in Calicut) at their Mysore unit. The project aimed at reducing the Work-In-Progress (WIP) from more than 10 days to less than 6 days. We have also implemented 5S in their unit and

Read More